§ Technical brief
TidalCore — concept-stage technical brief
A study of a compact heat-pipe microreactor for maritime hubs, evaluating shore power and high-temperature process heat for hard-to-electrify port operations. Every figure below is a concept target or study assumption.
Hardware status — No TidalCore reactor hardware has been built, fuelled, or tested. 15 MWth, ~850 °C, and every other parameter published here are concept targets and study assumptions from reduced-order models, pending independent validation.
1. Concept targets
- Thermal power
- 15 MWth (concept target)
- Electrical output
- 5.0 MWe net, electric-priority (~5.3 MWe gross, ~6% house load)
- Efficiency
- ~35.5% gross / ~33% net sCO₂ cycle (concept target)
- Cogeneration option
- ~6 MWth process heat + ~3 MWe net (never above 15 MWth total)
- Core life
- 12-year target core
- Core outlet temperature
- ~850 °C (concept target)
- Primary heat transport
- Sodium heat pipes (passive, no pumped primary coolant)
- Fuel
- HALEU TRISO particle fuel (supply not secured)
- Power conversion
- Supercritical CO₂ Brayton cycle (study assumption)
- Module
- Factory-sealed, transportable (study assumption)
2. Deployment phases
- Phase 1 — electricity-only export to a port MV substation for shore power and microgrid loads.
- Phase 2 — co-located high-temperature process heat, only after Phase 1 protocols exist.
3. Port siting envelope
- Module footprint
- ~180 m² per module (study assumption)Excludes switchgear, security buildings and laydown.
- Security & controlled area
- To be set by site-specific analysisStandoff and exclusion distances are an open licensing question under Part 53 and NRC security rules — not assumed here.
- Siting options
- Quay-side (on land) or barge-mountedBarge option would need adequate berth water depth and mooring; depth is port-specific.
- Grid connection
- Port MV substation, 6.6 kV / 11 kV classTypical shore-power voltages; exact interface depends on the host port.
- Crane & berth clearance
- Sited outside crane rail and berth operating envelopePlacement is a planning assumption to avoid disrupting cargo operations.
- Natural hazards
- Seismic, flooding, storm surge and tsunami screening requiredNo site has been characterised; design-basis hazards are unknown.
4. Proposed licensing pathway (NRC 10 CFR Part 53, effective 2026-04-29)
- NRC pre-application engagement — not started
- Part 53 conformance gap analysis — planning assumption
- Design-stage application route — open question
- USCG / host-port interface protocol — not started
- Site-specific licensing at a host port — target, no host port
TidalCore holds no licence, approval, fuel allocation, port agreement or partnership. Nothing here guarantees any technical, regulatory or funding outcome. More detail: specifications, regulatory pathway, data room.