A $3M pre-seed plan to take port-energy nuclear from concept toward NRC pre-application.
TidalCore is a pre-incorporation conceptual study of the maritime nuclear infrastructure interface — the point where reactors, ports, grids, shore power, industrial heat users, regulators, operators, security and workforce meet. The plan stacks non-dilutive federal support (GAIN, SBIR, ARPA-E) underneath a focused equity raise so the first 18 months produce verifiable regulatory, modelling and port-use-case milestones. No award, agreement or outcome is promised.
Hardware status — No TidalCore reactor hardware has been built, fuelled, or tested. 15 MWth, ~850 °C, and every other parameter published here are concept targets and study assumptions from reduced-order models, pending independent validation.
Federal and international activity through August 2026 — the IAEA ATLAS initiative and MARAD's agreements with the Port of Long Beach (2026-07-22) and Port of Corpus Christi (2026-08-19) — indicates the port interface is under active public examination. TidalCore is not a party to any of it and claims no endorsement or relationship.
TidalCore is an independent concept-stage development study. It is not a licensed reactor design, no application has been submitted to the U.S. NRC, and no approval, review, or endorsement by the NRC, DOE, USCG, IMO, MARAD, any national laboratory, port, or utility is claimed or implied. All figures are modeled design targets subject to independent validation.
How early support connects to non-dilutive programs
| Support level | Funds work on | Program it prepares for |
|---|---|---|
| $50 – $250 | Literature, standards and data review | Supports preparation of DOE SBIR/STTR Phase I topic responses |
| $1,000 | Regulatory pathway scoping | Groundwork for a DOE GAIN voucher application (national-lab cost share is in-kind, not cash) |
| $5,000 | Independent subsystem review | Evidence base for ARPA-E or DOE FOA concept papers |
| $25,000+ | Port use-case study | Port-side analysis that a port applicant could reference in a MARAD PIDP proposal — PIDP is awarded to ports, not to TidalCore |
No application has been submitted and no award, match or cost share is guaranteed. Support is voluntary and is not equity, an investment, or a tax-deductible donation. Sponsor the research
Fig. 0 · Funding readiness dashboard
Technology readiness (DOE TRL)
EVDOE G 413.3-4ANRC Part 53 engagement checklist
EV10 CFR Part 53- ✓Part 53 review of design objectives + safety functions
- ✓Regulatory pathway comparison (Part 50 / Part 52 / Part 53)
- Pre-application meeting request to NRC NRR ARP
- Regulatory Engagement Plan (REP) draft
- Principal Design Criteria per RG 1.232 / RG 1.233
- Topical report — sealed heat-pipe passive safety case
- Topical report — TRISO fuel qualification adoption
- Environmental Report scoping (NEPA)
Target capital stack (18-month plan)
Assumption· Target composition- Non-dilutive federal (GAIN / SBIR / ARPA-E)40%
- Pre-seed equity40%
- Strategic / corporate CVC15%
- State / port-authority co-funding5%
Fig. 1 · The proposed funding stack — no awards applied for or received
DOE Gateway for Accelerated Innovation in Nuclear — in-kind national-lab access (INL) for neutronics validation against MCNP6 and TRISO performance review. Applied for on a competitive basis; no voucher has been requested or granted to date.
DOE Office of Nuclear Energy SBIR topics on advanced reactor manufacturing, instrumentation, and HALEU fuel cycle. Published Phase I / Phase II ceilings are roughly $250K and $1.6M; no award has been applied for or received.
ARPA-E MEITNER/GEMINA-class solicitations; DOE Advanced Reactor Demonstration Program risk-reduction awards. Historical award sizes of roughly $2–5M over 18–24 months; TidalCore has not applied.
Nuclear-specialist + climate deep-tech VCs. 18-month milestones to NRC Part 53 pre-application meeting, signed port-host LOI, and third-party neutronics validation.
Fig. 2 · Planned use of a $3M pre-seed
- Regulatory & licensing38%
NRC pre-app counsel, Part 53 gap analysis, REP authoring, topical reports
- Technical validation24%
Third-party MCNP6 + Serpent neutronics; TRISO performance review; safety case draft
- Team & founders22%
Founder salary (below-market), 1 reactor physicist, 1 licensing lead, 1 BD
- Port + off-taker BD10%
Site studies, LOI negotiation, USCG / port-authority engagement
- G&A + IP6%
Legal entity, patent prosecution, insurance, SAM.gov compliance
Fig. 3 · 18-month milestone plan
- Month 1 · M1Delaware C-corp + provisional patent filed
- Month 1 · M2SAM.gov + Grants.gov + ORCID registration
- Month 2 · M3NRC NRR Advanced Reactor Programs pre-application dialogue opened
- Month 3 · M4GAIN voucher application submitted (INL host lab)
- Month 6 · M5Port-authority MOU executed (Houston / Corpus Christi / Long Beach)
- Month 9 · M6Third-party MCNP6 neutronics cross-validation complete
- Month 12 · M7SBIR Phase I award + pre-seed term sheet
- Month 18 · M8NRC Part 53 Regulatory Engagement Plan filed
Traction checklist
Target investor categories
| Nuclear-specialist | Energy Impact Partners · At One Ventures · Valor Equity · MCJ Collective |
| Climate deep-tech | Lowercarbon Capital · Breakthrough Energy Ventures · DCVC · Refactor Capital |
| Frontier / hard-tech | Starshot Capital · Founders Fund (energy thesis) · Khosla Ventures |
| Strategic / corporate | Shipping line CVCs · ammonia & methanol producer CVCs · port-authority innovation funds |
Categories are illustrative; named firms reflect public theses in advanced nuclear and climate hard-tech. No commitment, no conversation, no implied endorsement.
Request access to the gated investor materials.
The data room contains the founder-track pitch deck, full technical dossier, financial model, IP summary, and the regulatory engagement strategy. Access granted on signed mutual NDA.
Forward-looking statement: financial figures, milestones, and timelines reflect a pre-incorporation plan and are subject to change. Not an offer to sell or a solicitation of an offer to buy securities. Securities, if and when offered, will be offered only under exemption pursuant to applicable U.S. law.